from study confidence to construction funding

ALM.ASX explores for copper, with drilling geometry and resource-definition evidence setting the investment case; resource quality, PFS execution and financing access determine whether Briggs can move beyond an exploration-stage discount.

A large inventory still needs mine-plan confidence

The market is treating Alma as a pre-production junior whose 932Mt Briggs resource is too early to value; we believe the November 2025 positive Scoping Study and progression to PFS make Briggs a credible development candidate, but only if resource confidence and project funding improve together. Alma has no operating mine, and Briggs is the principal value anchor, while East Kimberley remains a contingent portfolio asset.

PFS and capital access are the next proof points

  • Resource scale is real, mine-plan certainty is not: The 932Mt inventory provides a substantial base for PFS work, but the large Inferred component limits confidence in pit design, grade distribution and future reserve conversion. A stronger Indicated component would make more of the study case investable.
  • Metallurgy supports the flowsheet, with scale-up still relevant: Disclosed testwork reports 93-96% rougher copper recovery and 93-95% locked-cycle recovery, including coarse to very coarse grind sizes.
  • The market has a measurable alternative to a pure explorer valuation: The November 2025 study decision supports conventional crush-grind-flotation processing and PFS advancement.

No target value until project economics are disclosed

  • Valuation is withheld pending further disclosure of the commercial economics required to support an institutional-grade valuation.
  • Primary valuation dependency: PFS capex, operating cost, recovery and mine-plan confidence determine whether Briggs moves from a resource-backed option to a project investors can fund. East Kimberley should receive limited credit until its access and heritage processes produce a defined work programme.
  • Outcome to valuation: A PFS with accepted capital intensity and a credible project-level funding package would increase the value attached to Briggs. A higher-cost design or weaker funding terms would leave the current market value exposed to delay and dilution.

What changes our view

  • We would become more bullish if H2 2026 to H1 2027 delivers a PFS with a larger Indicated resource base, defined capex and operating assumptions, and funding discussions that support Alma’s path from 51% towards 70% ownership by 30 June 2031.
  • We would reduce conviction if PFS work weakens the reported recovery range, requires materially higher capital intensity, or the approvals and stakeholder programme slips beyond the stated 4-5 year pathway.
  • Dominant failure mode: A construction funding package that cannot be assembled on acceptable project, strategic or JV terms would keep Briggs in study-stage valuation, even with its large resource and prior metallurgical results.

General information only: This report is general in nature and has been prepared without taking into account your objectives, financial situation or needs. Consider whether it is appropriate for you and seek licensed advice where required.

This report has not been commissioned or paid for by the company and may be AI-assisted. See Important Disclosures for publisher, conflicts, research policy and distribution information.

© 2026 InvestHouse Financial Services Pty Ltd. All rights reserved.

Cover · Investment SummaryInvestHouse
ALM.ASXResearch ReportInvestHouse Research
ALM : ASXPAGE 02 / 10
Section Lens
02

The quarter moved Briggs into PFS

Quarterly snapshot
Last four reported quarters
CASH A$3.6M · BURN A$2.1M/QTRQ1Q2Q3Q4Q5Q6Q7Q8FUNDED · 2.1 QTRS INCL. FACILITIESQUARTERS OF RUNWAY AT LATEST BURNEXPLORATION A$1.5M · ADMIN A$0.2M
Sep 25Open
Dec 25Open
Mar 26Open
Jun 26Open
Cash
A$0.47m
A$2.63m
A$1.85m
A$3.56m
Receipts
A$0.00m
A$0.00m
A$0.00m
A$0.00m
Burn / OCF
A$0.92m
A$0.00m
A$0.77m
A$2.08m
Exploration
A$0.61m
A$0.79m
A$0.50m
A$1.52m
Admin
A$0.19m
A$0.20m
A$0.16m
A$0.16m
Funded qtrs (incl. facilities)
0.5q
Self-funded
2.4q
2.1q

Latest reported funding covers 2.1 quarters including undrawn facilities. Cash alone covers 1.7 quarters of total burn.

Drilling completed; the resource read-through remains central

What changedEvidenceConsequence
Briggs drilling program completed10 December 2025 release; hole 25BRD0038 reached 392.7m2026 infill work can support PFS inputs
Step-out geology matched the block model25BRD0038 showed mineralisation consistent with the MREResource confidence improved, pending assays
Deep drilling extended the tested envelope25BRD0037 returned 222.2m at 0.26% CuContinuity evidence became more relevant to mine planning

The December 2025 drilling completion moved Briggs from field execution into interpretation and study use. Hole 25BRD0038 was drilled 80m along strike from 25BRD0037, while the earlier hole returned 222.2m at 0.26% Cu, 48ppm Mo and 0.72g/t Ag from 9m. We view the geological match to the April 2025 MRE as incremental support for continuity, rather than a standalone resource increase.

  1. 01Assay flow: The 10 December release identified assays for 25BRD0038 and the remaining section of 25BRD0037 as forthcoming; the selected pack provides no later confirmation, making the assay read-through the key quarterly follow-up.
  2. 02Study relevance: Further northwest infill drilling planned for 2026 is intended to improve mine-planning inputs and support an updated MRE, rather than establish a production profile.

Scoping cleared; PFS became the work programme

The 13 November 2025 scoping announcement confirmed a positive Scoping Study and progression to PFS, following an MRE of 932Mt at 0.21% Cu, 36ppm Mo and 0.6ppm Ag. The study established a conventional open-pit and flotation pathway, while the SPP completed on 24 December 2025 raised A$2.1m at 0.6c. That combination supports near-term study continuity, but the market still needs disclosed PFS economics and development funding terms before assigning broader project value.

  1. 01House read: We believe the December raise narrowed the immediate execution discount because it funded continuity after the 2025 drilling and scoping work; it did not resolve the capital required beyond PFS.
  2. 02Secondary asset: East Kimberley remained a contingent portfolio option during the period, with Briggs continuing to receive the principal technical and capital attention.
  3. 03What changed conviction: The evidence now supports a more defined study pathway at Briggs; conviction would increase with final assays, an updated MRE and PFS outputs that quantify capex, operating costs and payable metal.
The quarter moved Briggs into PFS · Section LensInvestHouse
ALM.ASXResearch ReportInvestHouse Research
ALM : ASXPAGE 03 / 10
Section Lens
03

Briggs: scale is established; mine-plan confidence is not

Lead asset
Explorer underwriting anchor
Company stageExplorer
Current gateGeological continuity and resource-definition proof
Study anchorSCOPINGBriggs

932Mt provides scale, but 793Mt remains Inferred

QuestionAnswer
Can it work?Briggs has the scale, copper grade and conventional open-pit flotation concept to justify PFS-level development work.
House convictionConstructive on asset quality, but recognition should increase with mine-plan definition rather than headline tonnes alone.
Strongest evidenceThe April 2025 MRE contains 932Mt at 0.21% Cu, 36ppm Mo and 0.6ppm Ag, including 2.0Mt of contained copper; the November 2025 Positive Scoping Study supported progression to PFS.
Biggest uncertainty793Mt is Inferred, so mine scheduling, reserve conversion and capital intensity remain less certain than the resource scale suggests.
Missing proofPFS-level capex, opex, throughput, mine life and infrastructure assumptions are not disclosed.
What changes the answerAn updated resource and PFS that preserve grade, recovery and project scale would make Briggs more investable than a conventional exploration vehicle.

The November 2025 Positive Scoping Study moved Briggs from resource definition into structured development work, while the 10 December 2025 drilling update reported that hole 25BRD0038 matched the April block model across a 392.7m hole. That continuity is more important than an isolated intercept because it supports the existing mineralised envelope and reduces the risk that the MRE is built around disconnected zones. Alma holds 51% through the Canterbury Resources joint venture, with a disclosed path to 70%.

The resource is large, but its low average copper grade makes recovery, throughput, power and water assumptions central to cash-flow conversion. Prior testwork reported 93-96% rougher copper recovery and 93-95% locked-cycle recovery, including coarse to very coarse grind sizes. A formal PFS-scale recovery rate is not disclosed; the testwork supports the flowsheet concept, while variability and scale-up work must determine how those results translate into engineering design. If the PFS converts this evidence into credible capex and operating costs, investors can underwrite future concentrate cash flow rather than study-stage resource value.

Metallurgy supports the concept; variability and scale remain to prove

  1. 01Processing: Conventional crush-grind-flotation, with SABC or HPGR options, gives Briggs an established flowsheet rather than a novel processing route; coarse-grind recovery results could support lower power intensity if maintained across the orebody.
  2. 02By-products: The 73Mlb molybdenum and 16.5Moz silver inventories provide potential payable credits, with a molybdenum circuit identified as a PFS workstream rather than included as established operating value.

PFS must convert resource scale into mine-plan confidence

The Central Queensland location supports a comparatively familiar Australian operating jurisdiction, but power, water, logistics, geotechnical inputs and tailings design still need project-specific definition. East Kimberley remains a separate strategic exploration option and does not compete with Briggs for near-term asset credit.

The dominant failure mode is a PFS mine plan that reduces recoveries, throughput or economic scale materially from the Scoping Study concept, cutting the value attached to Briggs before construction funding is considered. We believe the market is treating Briggs too much like a static resource; the next credible study should show whether its continuity and metallurgy support a fundable development case. If that occurs, Alma becomes a copper developer with measurable mine economics; otherwise it remains a resource-scale exploration option.

Briggs: scale is established; mine-plan confidence is not · Section LensInvestHouse
ALM.ASXResearch ReportInvestHouse Research
ALM : ASXPAGE 04 / 10
Section Lens
04

Selective capital markets raise the proof threshold

Selective capital rewards milestones

Copper is the lead commercial exposure. Smelters and traders ultimately pay for copper concentrate, while demand is linked to electrification, electric vehicles, renewable generation, data centres and grid investment. Alma’s 2 April 2026 presentation describes constrained supply and limited near-term project development as supportive of copper pricing, but the supplied macro pack does not provide current copper inventory, benchmark pricing, concentrate treatment charges or new-supply data. The commodity case therefore supports the relevance of Briggs, rather than proving a near-term price uplift.

The November 2025 positive scoping announcement moved Briggs into PFS work, but did not disclose the capex, operating cost, production or cash-flow inputs required for a single-case DCF. The market consequence is specific: a supportive copper tape can improve investor appetite for drilling and study capital, but it cannot substitute for a measurable development case. The May 2026 A$4.0m placement demonstrates access to equity capital for the current work programme, while future funding terms will depend more on PFS quality and project-level participation than on copper sentiment alone.

Copper cycle evidence is not supplied

The long-term demand framing is constructive, but the available evidence is issuer guidance rather than an independent copper cycle dataset. The 2 April 2026 presentation identifies electrification, EVs, renewables and data centres as demand drivers and describes supply as constrained. Those themes support a large, long-lived copper deposit, yet they do not establish the incentive price, project ranking or timing of a market deficit. Briggs remains relevant through its 2.0Mt contained copper resource, while the value assigned to that inventory still depends on mine planning and study evidence.

Briggs needs financeability, not just a better tape

Selective capital markets increase the value of dated operating evidence. The last supplied macro observations recorded a US Federal Funds target range of 3.50% to 3.75% on 18 March 2026 and a US 10-year Treasury yield of 4.31% on 14 April 2026, conditions consistent with selective rather than indiscriminate junior-mining funding.

  1. 01PFS inputs: release of capital, operating and scheduling assumptions would move Briggs from resource exposure towards a financeable development assessment.
  2. 02Funding mix: evidence of project debt, strategic or JV equity, or offtake prepayment would reduce reliance on repeated head-company equity.
  3. 03Copper signals: global benchmark pricing, visible inventories, concentrate-market conditions and delayed or added supply should determine whether the commodity backdrop is strengthening or weakening.

We believe copper sentiment can support Alma’s next financing, but only PFS quality and a credible funding mix can make more of the project value measurable.

Selective capital markets raise the proof threshold · Section LensInvestHouse
ALM.ASXResearch ReportInvestHouse Research
ALM : ASXPAGE 05 / 10
Section Lens
05

The next Briggs milestones that can move value

Next proof
Stage-native catalyst
Current gateGeological continuity and resource-definition proof
Next proofThe next drill, continuity or resource milestone

Indicated tonnes matter more than headline tonnage

The 10 December 2025 drilling update confirmed completion of the Briggs programme, with 25BRD0038 matching the block model over 392.7m; assays for that hole and the remaining 25BRD0037 interval are still awaited as at 22 August 2026. The June 2025 quarterly report disclosed no debt and liquidity of about A$3.2m, supporting near-term study work but not the later build decision.

EventInvestment meaningCurrent market viewOur viewValuation impact
Final assays and MRE update, now overdue against early-2026 guidanceTests whether drilling converts additional material into Indicated tonnes and improves mine-plan confidencePositive visual logging is likely receiving partial creditThe highest-value near-term event is a material increase in Indicated tonnes, not more Inferred inventoryHigher resource confidence can increase study-value recognition; disappointing grades or continuity would reduce it

PFS decides whether the study survives engineering

The Positive Scoping Study released on 13 November 2025 supported PFS progression. The PFS must quantify mine scheduling, comminution, variability metallurgy, infrastructure and capital intensity. Reported recovery rate is 93-96% in rougher tests and 93-95% in locked-cycle tests, but scale-up and concentrate quality remain design inputs. If the PFS supports a buildable operating case, the market can value Briggs against a defined development pathway rather than resource scale alone.

Funding and approvals set the route to commissioning

Baseline environmental work and the approvals pathway, outlined at 4-5 years in November 2025, are long-duration milestones. Alma holds 51% of the JV and can reach 70% by spending about A$7m by 30 June 2031. We believe the market is correctly withholding full project credit until PFS economics and a credible funding package identify who carries construction capital.

Investment committee view: Briggs merits ownership only for investors prepared to underwrite staged study and funding risk. We would become more bullish if the overdue assays support an MRE upgrade and the PFS supplies credible capital and operating parameters. We would reduce conviction if the MRE update is not delivered by Q4 2026 or the PFS identifies materially weaker recoveries than the reported 93-96% rougher range. The dominant failure mode is the funding package, because it determines whether study value can become shareholder-owned cash flow.

The next Briggs milestones that can move value · Section LensInvestHouse
ALM.ASXResearch ReportInvestHouse Research
ALM : ASXPAGE 06 / 10
06Decision Variables

Valuation & funding

Can the company fund the next value gate on acceptable terms?

Market Cap
A$21m
Last Price
A$0.008
Cash
A$3.56m
Net Cash
A$3.56m
Valuation decisionThe discount in plain English
Question
Answer
House read
House value depends on proof, not headline study value.
Why we stop at that credit
The equity model haircuts the full project case because the next technical, permitting or operating proof point has not yet landed.
Why the discount exists
the next technical, permitting or operating proof point has not yet landed
Market read
Market is paying for confirmed evidence, not the full project case yet.
Most valuable proof
The next valuation test is whether the next milestone changes model risk, not just the news count.
What breaks it
Weak technical evidence or a delayed proof point keeps the discount in place.
Target disciplineWhy we only recognise that share of value today
Question
Answer
Market metric
target value construction is the anchor; producer multiples are only relevant after production or cash flow evidence.
Comparator basis
No like-for-like resource peer denominator is available. The resource line is an implied-target reconciliation, not peer validation; it neither proves nor disproves the accepted valuation.
Why not the top case
Target is the base evidence case, not a full-success case. We stop here because the next technical, permitting or operating proof point has not yet landed. Higher credit needs the next technical, permitting or operating proof point.
Binding constraints
the next technical, permitting or operating proof point has not yet landed
Market discountWhy the market discounts it
  • Funding — High severity
  • Commodity — Medium severity
  • Jurisdiction — Medium severity
  • Resource confidence — High severity
Valuation decisionThe discount in plain English
Question
Answer
House read
House value depends on proof, not headline study value.
Why we stop at that credit
The equity model haircuts the full project case because the next technical, permitting or operating proof point has not yet landed.
Why the discount exists
the next technical, permitting or operating proof point has not yet landed
Market read
Market is paying for confirmed evidence, not the full project case yet.
Most valuable proof
The next valuation test is whether the next milestone changes model risk, not just the news count.
What breaks it
Weak technical evidence or a delayed proof point keeps the discount in place.
Target disciplineWhy we only recognise that share of value today
Question
Answer
Market metric
target value construction is the anchor; producer multiples are only relevant after production or cash flow evidence.
Comparator basis
No like-for-like resource peer denominator is available. The resource line is an implied-target reconciliation, not peer validation; it neither proves nor disproves the accepted valuation.
Why not the top case
Target is the base evidence case, not a full-success case. We stop here because the next technical, permitting or operating proof point has not yet landed. Higher credit needs the next technical, permitting or operating proof point.
Binding constraints
the next technical, permitting or operating proof point has not yet landed
Market discountWhy the market discounts it
  • Funding — High severity
  • Commodity — Medium severity
  • Jurisdiction — Medium severity
  • Resource confidence — High severity
Online modelOpen the full valuation detail online

The print page keeps the decision table readable. The portal carries the full stage stack, assumptions, sensitivity, funding mechanics and peer context.

View valuation detail ↗
Valuation & fundingInvestHouse
ALM.ASXResearch ReportInvestHouse Research
ALM : ASXPAGE 07 / 10
07What Backs The Number

Evidence & execution

Evidence strengthWhat is proven versus still speculative in the house target
Thesis leg
Evidence status
Value
Weight
Known drilled inventory
Proven intercept geometry
Not yet modelled
Evidence case
Potential inventory
Continuity / width still open
Growth envelope
Speculative until wider envelopes close
Blue sky
System-scale case
Success case
Not in evidence case
Proof pointsVisible proof and the next valuation test
Balance sheetA$3.56m cash context Known
Next prooffunding terms if work accelerates
Evidence statusWhat is established, supported by current evidence, and still needs proof
Area
Evidence status
Read-through
Lead asset quality
SUPPORTED
Useful asset, proof still matters
Funding path
SUPPORTED
Main valuation discount
Valuation evidence
SUPPORTED
Upside depends on proof
Technical and contract proof
SUPPORTED
Needs next technical proof
Logistics and infrastructure
SUPPORTED
Acceptable, with permitting work
Study-to-funding delivery
SUPPORTED
Needs milestone delivery
FID and catalyst timing
SUPPORTED
Timing is visible but not immediate
Evidence & executionInvestHouse
ALM.ASXResearch ReportInvestHouse Research
ALM : ASXPAGE 08 / 10
08Institutional Cross-Check

Model & peer context

Market Cap
A$21m
Last Price
A$0.008
Cash
A$3.56m
Net Cash
A$3.56m
Model & peer contextInvestHouse
ALM.ASXResearch ReportInvestHouse Research
ALM : ASXPAGE 09 / 10
09

Leadership & Register

Registeras at 18 Sept 2026Boardas at 03 Oct 2026Valuation04 Sept 2026
Board & Key PersonnelComposition
01
Alasdair CookeExecutive Director
Executive Chairman; the 2025 annual report says he has chaired the Board since the Company’s incorporation and describes his resource exploration and mine-development experience.
02
Charles (Frazer) TabeartManaging Director
Managing Director and geologist; the 2025 annual report notes more than 30 years’ experience in international exploration and mining and expertise in porphyry copper mineralisation.
03
John DeanNon-Executive Director
Non-executive director with mining operations and project-development experience at First Quantum Minerals.
04
Valentine ChitaluNon-Executive Director
Non-executive director; an accountant and finance professional with experience in private equity, corporate finance and business development.
Top 20 ShareholdersOrdinary shares • ALM
as at 18 Sept 2026 · board 03 Oct 2026
Bottom line
Top 20 holders account for 46.3% of disclosed ordinary shares.
Leadership & RegisterInvestHouse
ALM.ASXResearch ReportInvestHouse Research
ALM : ASXPAGE 10 / 10
Important Disclosures & Disclaimer

Important disclosures
and disclaimer

General information only. Not personal advice. Readers should assess suitability and seek licensed advice where appropriate.

Publisher and Regulatory Status
This research has been prepared and published by InvestHouse Financial Services Pty Ltd (ACN 669 520 174). InvestHouse Financial Services Pty Ltd is a Corporate Authorised Representative (No. 001304496) of Point Capital Group Pty Ltd (ABN 41 625 931 900), holder of Australian Financial Services Licence No. 518031. The views, opinions, recommendations, valuations, and price targets expressed in this research are those of InvestHouse and the identified author(s).
General Information Only
This document is supplied solely for information. Any financial advice contained in it is general only and has been prepared without reference to any person's objectives, financial situation or needs. Investors should assess the appropriateness of the information in light of their own circumstances and, where appropriate, seek advice from a licensed financial adviser before acting on it.
Nature of the Research
The views expressed in this report reflect the opinions of the author(s) as at the date of publication and are based on publicly available information believed to be reliable at the time of writing. Forecasts, estimates, valuations, price targets, and forward-looking statements are inherently uncertain and subject to change without notice. This report does not constitute an offer or invitation to purchase securities and should not be relied upon in connection with any contract or commitment.
Conflicts of Interest
InvestHouse Financial Services Pty Ltd, its related entities, directors, officers, employees, or associates may have provided, may currently provide, or may in the future provide corporate advisory, capital markets, investor relations, media, consulting, or other commercial services to companies mentioned in this report. They may also trade in securities that are the subject of this report and may earn brokerage, commissions, fees, or other benefits in connection with recommendations or dealings by clients in those securities. Some representatives may be remunerated wholly or partly by commission.
Analyst Certification
Each analyst or author responsible for this report certifies that the final published views, opinions, valuations, and price targets accurately reflect their personal, independent, and objective assessment of the securities or issuers discussed. No part of their compensation was, is, or will be directly or indirectly related to the specific recommendations, opinions, valuations, or price targets expressed in this report.
Research Policy and FSG
InvestHouse Financial Services Pty Ltd maintains internal arrangements designed to manage research independence, conflicts of interest, and separation between research, advisory, corporate, and capital markets activities. For further information, refer to the current Financial Services Guide and Research Independence Policy.
No Warranty or Liability
While this report is based on sources considered reliable, InvestHouse Financial Services Pty Ltd has not independently verified all information contained in this document and does not represent, warrant, or guarantee, expressly or impliedly, that it is complete or accurate. InvestHouse Financial Services Pty Ltd accepts no responsibility to update any advice, views, opinions, or recommendations or to correct any error or omission that becomes apparent after publication.
Jurisdiction and Distribution
This document is not directed to, or intended for distribution to or use by, any person or entity in any locality, state, country, or jurisdiction where distribution, publication, availability, or use would be contrary to law or regulation, or would subject InvestHouse Financial Services Pty Ltd to any registration or licensing requirement. Specific jurisdictional restrictions may apply outside Australia.
Copyright and Use
© 2026 InvestHouse Financial Services Pty Ltd. All rights reserved. All material presented in this document, unless specifically indicated otherwise, is under copyright to InvestHouse Financial Services Pty Ltd. This document is a private communication disseminated by InvestHouse Financial Services Pty Ltd and must not be altered, transmitted, copied, distributed, or used by any other party without its prior written consent.
AI-Assisted Research and Analyst Review
InvestHouse Research uses a combined AI and analyst-review pathway. AI tools may assist with data extraction, summarisation, drafting, modelling support, editing, and report structuring. The final report is reviewed by an analyst or author before publication, but AI-assisted workflows and source data may still contain errors, omissions, or inaccuracies. Readers should independently verify all material information.
By accessing this report, you acknowledge these disclosures · For distribution only where lawful · InvestHouse Research